Storage Period

1 - 3 storage years (1.4.2025 - 1.4.2028)

Working Gas Volume

440 000 MWh

Injection Output

4 478 MWh/day

Withdrawal Output

7 371 MWh/day

21.1.2025 | (29x)

Storage Capacity Auction 28 January 2025

Auction Date: 28 January 2025, 10:00 a.m. (CET)

Type of storage capacity reserved: Annual storage capacity with the fixed output

Working Gas Volume: 440,000 MWh

Injection Output: 4,478 MWh/day

Withdrawal Output: 7,371 MWh/day

Storage period: 1-3 storage years (1 April 2025, 6 a.m. - 1 April 2028, 6 a.m.)

 

For additional information please contact: auction@mnd-es.cz
Ing. Josef Brůček Tel.: +420 775 877 182
Filip Červenka Tel.: +420 775 875 092

MND GS - sample storage contract - 28012025